possible release time line change proposed

Justin justin.obara at utoronto.ca
Mon Mar 23 12:32:43 UTC 2009


Hi Colin,

Thanks, this  sounds good to me. I like the idea of having consistency  
across the board and adding that extra bit of polish before we release.

I'll update the calendar and send out some e-mails to update everyone  
on the changed dates for the bug parade and testing.

thanks
Justin
On 20-Mar-09, at 5:10 PM, Colin Clark wrote:

> Justin,
>
> I think this makes a lot of sense. Bug squashing is moving along a  
> feverish pace, but we've been lagging behind a bit in terms of  
> reviewing patches as they are posted. An extra day would help ensure  
> that our code quality stays high.
>
> With this in mind, there are a few other interesting topics that are  
> emerging during the parade. I've been working on the new build  
> scripts for Infusion 1.0 based on Simon Wang's patch. There are some  
> interesting layers of complexity to this work, touching on a  
> previous discussion we had on list about whether to modify our  
> directory structure so that assets for a component are more self- 
> contained.
>
> One of our core goals for the 1.0 release is ensuring consistency  
> across the board. For example, our decision to normalize class names  
> across all components and the FSS. There's probably a bit more "i  
> crossing" and "t dotting" left to be done. These sorts of changes  
> cross-cutting changes are easier to do when we aren't fixing bugs  
> and managing patches.
>
> I'd like to propose that we extend our release by a week to give us  
> time to tweak and test our build scripts and ensure that we're  
> consistent across the board in terms of class names, directory  
> layout, and so on. That little bit of extra polish that comes with a  
> 1.0 release.
>
> Here's my proposed timeline:
>
> Bug parade: last day is March 24
> i-dotting/t-crossing parade: March 25-30
> Completely code freeze: March 31
> Release: April 7
>
> Thoughts?
>
> Colin
>
> On 20-Mar-09, at 4:47 PM, Justin wrote:
>
>> Hello,
>>
>> Bug-parade is moving along well, but could use another day to get  
>> fixes in and have time to complete code reviews and testing.
>>
>> This would require the shifting of code freeze and the release date.
>>
>> Current Timeline
>>
>> Bug Parade: last day is March 23
>> Code Freeze: March 24
>> Release: March 31
>>
>> I would like to add a day to the bug parade, but would still need  
>> the four days for testing. I'm not sure it is a good idea to  
>> release on April 1st and there may be some issues that will take  
>> longer to properly fix.
>>
>> Anyone have any dates that they think would make sense and be  
>> acceptable.
>>
>> Thanks
>> Justin
>> Justin
>
> ---
> Colin Clark
> Technical Lead, Fluid Project
> Adaptive Technology Resource Centre, University of Toronto
> http://fluidproject.org
>